
Over View |
| |

Automatic Turbine Start-up |
| |

Lub.Oil System Schematic |
 |
|
- Turbine speed and Load Control
- Automatic Turbine Start-up control
- Line Speed Matching Control
- Full Arc admission (FA)/Partial Arc admission (PA) Transfer, if applicable
- Initial Pressure Regulator (IPR)
- Power Load Unbalance (PLU)
- Turbine Trip Function
- Turbine Trip Initiation (Primary overspeed, backup overspeed, EHC failure)
- Test Function (Valve Test, Overspeed Trip Test, Back up Overspeed Trip Test)
- Control and monitoring function of turbine generator auxiliaries
- Extraction Steam Pressure Regulation (if applicable)
- Thermal Stress Calculation
- TSI (Turbine Supervisory Instruments) monitoring
- Back up operation and monitoring at monitor panel of EHC cabinet
- Interface with Distributed Control System (DCS)
|