Maintenance Items for Operating Time
Maintenance Points for Major Components
  Capacitance Measuring Robot
Site Search


Thermal Power
  Home > Thermal Power > Services & Maintenance > Generators & Electrical Systems >

Inspection Services

 

We recommend generator maintenance as per below.


Maintenance Points for the major components Field Winding(1) Field Winding(2) Retaining Ring Rotor Shaft and Wedge Bearing Seal Ring Packing Gland High Voltage Bushing Generator Cooler AC Exciter Stator Core Stator Winding Stator Winding Insulation for Water Cooled Machine Stator Winding Insulation


Field Winding (1)  
Overall inspection for field endwinding, pole to pole connector, cooling ventilation holes, maim lead etc.


Field Winding (2)  
In case of winding-short
Measure impedance at decreasing number of rotations or checking of no-load saturation properties at test-running, these are effective methods


Retaining Ring  
Stress Corrosion Cracking
Replacement of 18Mn-5Cr retaining ring to18Mn-18Cr retaining ring that has excellent anti-SCC properties


Rotor Shaft and Wedge Page Top
Crack on rotor shaft or wedge caused by repetition of start & stop, vibration due to rotation or load fluctuation
Non-Destructive Examination of Rotor & Auxiliaries
(Every 15 years or 100 thousand operation hours)


Bearing  
Exfoliation, wrinkle or contact of metal caused by repetition of start & stop and vibration due to rotation or load fluctuation.
Increasing vibration caused by deterioration of insulation plate.
Visual Inspection, NDT (Non-Destructive Test), Clearance adjustment


Seal Ring  
4 piece type: deterioration of spring strength. 2 piece type: Impossible to repair after ingress of foreign material.
4 piece type: Repair and reuse within tolerance. 2 piece type: Recommendation to prepare spare seal rings


Packing Gland  
Hydrogen gas leakage caused by deterioration of packing due to thermal stress and repetition of start & stop.
Every 2 years: Fastening bolts Every 15 years: Replacement of packing


High Voltage Bushing  
Hydrogen gas leakage caused by deterioration of gasket due to thermal stress and repetition of start & stop.
Replacement of gasket with HVB overall


Generator Cooler Page Top
Water leakage caused by corrosion or erosion or Stress Corrosion Cracking
Inspection of Tube Inside by Fiber-Scope, Inspection of Tube by Eddy Current Examination


AC Exciter  
Inspections same as generator Standard inspection detailed inspection


Stator Core  
Looseness, Short circuit of lamination caused by over excitation
Tightness check, EL-CID Test


Stator Winding  
Looseness of stator wedge and endwinding tie
Overall inspection for stator winding


Stator Winding Insulation for Water Cooled Machine  
Water leakage caused by galvanic corrosion at clip brazed portion Remarkable deterioration of insulation dielectric strength level
Capacitance Mapping Test for Water Cooled Stator Winding


Stator Winding Insulation  
Deterioration of Insulation
Diagnostic test


 
To Top