- Existing CCR -
- Long layout 50 × 12m
- Individual unit operation by the hardware operation panel
|
- Concept of design -
- Use of existing space
- Reduction of operator work load
- Recognition of the plant status by all operator with large screen
- Replace existing alarm panel with large size LCD (Liquid Crystal Display)
- Total design by professional designer
- Design for environment, lighting, view and movement of operator by ergonomics
|

Lighting layout by brightness calculation |
- Long layout 50 × 12m
- Individual unit operation by the hardware operation panel
|
|
|
|
 |
 |
 |
|