Customer: |
Chubu Electric Power Company in Japan |
| |
Plant Name: |
Hekinan Power Station (Units 4 & 5) |
| |
Plant Type: |
Conventional Thermal Power Plant |
| |
Rating: |
1000MW |
| |
Operation: |
Full Plant Automation |
| |
Equipment:
(for one unit) |
| Operator Station |
4 sets |
| Engineering & Diagnostic Station |
1 set |
| Sequence of Events |
1 set |
| Redundant Control System |
10 sets |
| |
Including: |
Boiler/Turbine/Electrical Sequence Control
Turbine Control/Protection/AVR
BFP-Turbine Control (2 sets)
Turbine Local Control, PAS |
|
| |
I/O Points: |
4,500 points (except for Boiler control) |