TOSHIBA Top Page

Power Systems Company
Toshiba Worldwide
Language selector Japanese
Products & Services
Introduction
Turnkey Solution
  I&C Renovation Project of TACOA Power Station
  TACHIBANA-WAN of Electrical Power Development Company(J-Power)
  HEKINAN of Chubu Electric Power Company
Advanced Service Packages
Ergonomic Design Development of Control Room
Unified operation of multiple units
Site Search


Thermal Power
  Home > Thermal Power > Services & Maintenance >

I&C Solution Services

 

I&C Renovation Project of TACOA Power Station


 

Features of System Configuration

 

 

Features of System Configuration

SVS Server Station AVR Generator Automatic Voltage Regulator
IES Integrated Engineering Station EHC Turbine Electro Hydraulic Control
RDS Remote Data Server LTDS Long-Term Data Server
SOE Sequence Of Event Device MO Magnetic Optical Disk Device
TAC1 Turbine Auxiliary Control System MT Main Turbine
TAC2 Turbine Modulating Control System BFPT Boiler Feedwater Pump Turbine
BAC Boiler Auxiliary Control System S/C System Controller
BCS Boiler Modulating Control System M/C Master Controller
DAS Data Acquisition System TSI Turbine Supervisory Instrument
R-I/O Remote I/O

CASE1: Full screen based operation & monitoring.
CASE2: 3 OPS and 1 alarm display / unit during normal plant operation.
CASE3: Any OPS can be available for any unit operation / monitoring during plant start-up.
CASE4: Administrator's station is available plant monitoring in office to power station staff.

 
To Top
  Site Map | Contact Us | Terms and Conditions | Privacy Policy Copyright (C)