TOSHIBA Top Page

Power Systems Company
Toshiba Worldwide
Language selector Japanese
Products & Services
Periodic Inspection
Precise Inspection
Life Assessment
Site Search


Thermal Power
  Home > Thermal Power > Services & Maintenance > Steam Turbines and Auxiliary System >

Inspection Service

 

Periodic Inspection


The following Table shows Toshiba's Periodic Inspection Programs, which consists of Class A, B and C Inspections.
Class Grade of
Inspection
Main & BFP Turbine Control Equipment Heat Exchanger Other Pumps Generator
A Complete Inspection Open upper casing. Remove rotor. Remove lower nozzle diaphragm, nozzle box and inner casing Disassemble each part of equipment and inspect completely. Remove channel cover and inspect for tube leak etc. Open upper casing. Remove rotor and inspect completely. Remove generator rotor and inspect completely
B Semi-complete Inspection Open upper casing only. Hold rotor in lower casing.       Disassemble both outer end shields (upper half), do not remove rotor, and inspect.
C Simple Inspection Do not open upper casing. Overhaul steam valves only. Remove cover or man / hand hole and inspect     Disassemble bearing caps only and inspect bearing.

 
To Top
  Site Map | Contact Us | Terms and Conditions | Privacy Policy Copyright (C)